Build
- 1. Place Upper Spacer on to the Yaw Pipe
- 2. Tack-weld Upper Spacer on to the Yaw Pipe
- 3. Placing of Bearing Mounting Plate and Lower Spacer
- 4. Tack-weld Bearing Mounting Plate and Lower Spacer
- 5. Weld Bearing Mounting Plate and Lower Spacer
- 6. Place the Wind Vane Socket
- 7. Weld the Wind Vane Socket
- 8. Paint the Nacelle
Overview
Materials
See pos. 5 in the BOM, not all materials listed there may be required at this point.
Build
1. Place Upper Spacer on to the Yaw Pipe
2. Tack-weld Upper Spacer on to the Yaw Pipe
3. Placing of Bearing Mounting Plate and Lower Spacer
4. Tack-weld Bearing Mounting Plate and Lower Spacer
5. Weld Bearing Mounting Plate and Lower Spacer
6. Place the Wind Vane Socket
Weld the Wind Vane Socket approximately 15 mm above the bottom.