Last edited by
lilal
Overview
![SubAssembly.Nacelle]()
Materials needed
No. |
Name |
Units |
TsDC-ID |
Reference |
x |
x |
x |
x |
x |
Tools needed
No. |
Name |
|
1 |
Welder |
|
2 |
Welding equipment |
Gloves, Helmet, Welding Magnets |
3 |
Square |
|
4 |
Angle Grinder |
|
5 |
Safety Glasses |
|
6 |
Level |
|
7 |
Meter |
|
Build
1.Place Upper Spacer on to the Yaw Pipe
![SubAssembly.Nacelle_1]()
2.Tack-weld Upper Spacer on to the Yaw Pipe
![SubAssembly.Nacelle_2]()
3.Place and Bearing Mounting Plate and Lower Spacer
![SubAssembly.Nacelle_4]()
4.Tack-weld Bearing Mounting Plate and Lower Spacer
![SubAssembly.Nacelle_5]()
5.Weld Bearing Mounting Plate and Lower Spacer
![SubAssembly.Nacelle_6]()
6.Place the Wind Vane Socket
15mm distance
![SubAssembly.Nacelle_8]()
7.Weld the Wind Vane Socket
![SubAssembly.Nacelle_9]()
8.Paint the Nacelle
![SubAssembly.Nacelle_10]()
9.Mount the Cable Gland
![SubAssembly.Nacelle_12]()