Last edited by lilal
Overview
Materials needed
No. |
Name |
Units |
TsDC-ID |
Reference |
5 |
nacelle |
1 |
ASM-MEC |
|
5.01 |
housing bearing |
2 |
COM-BUY |
UKF205, ball bearing unit with cast metal housing, locking on shaft via set screw |
5.02 |
bearing mounting plate |
1 |
COM-MAN |
Laser part, steel S235 or S355, 6 mm thick, no surface treatment, BearingMountingPlateUkf205.dxf |
5.03 |
upper spacer |
1 |
COM-MAN |
Laser part, steel S235 or S355, 6 mm thick, no surface treatment, UpperSpacer.dxf |
5.04 |
lower spacer |
1 |
COM-MAN |
Laser part, steel S235 or S355, 6 mm thick, no surface treatment, LowerSpacer.dxf |
5.05 |
yaw pipe |
1 |
COM-BUY |
Cylindric pipe, steel, no surface treatment, 60.3 x 3.65 x 140 mm |
5.08 |
exterior metal paint |
1 |
COM-BUY |
|
Tools needed
No. |
Name |
|
1 |
Welder |
|
2 |
Welding equipment |
Gloves, Helmet, Welding Magnets |
3 |
Square |
|
4 |
Angle Grinder |
|
5 |
Safety Glasses |
|
6 |
Level |
|
7 |
Meter |
|
Build
1.Place Upper Spacer on to the Yaw Pipe
2.Tack-weld Upper Spacer on to the Yaw Pipe
3.Place and Bearing Mounting Plate and Lower Spacer
4.Tack-weld Bearing Mounting Plate and Lower Spacer
5.Weld Bearing Mounting Plate and Lower Spacer
6.Place the Wind Vane Socket
15mm distance
7.Weld the Wind Vane Socket
8.Paint the Nacelle