Skip to content

GitLab

  • Menu
Projects Groups Snippets
    • Loading...
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
    • Contribute to GitLab
  • Sign in
  • W windkit
  • Project information
    • Project information
    • Activity
    • Labels
    • Members
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
  • Issues 8
    • Issues 8
    • List
    • Boards
    • Service Desk
    • Milestones
  • Merge requests 0
    • Merge requests 0
  • Deployments
    • Deployments
    • Releases
  • Wiki
    • Wiki
  • Activity
  • Graph
  • Create a new issue
  • Commits
  • Issue Boards
Collapse sidebar
  • erni
  • windkit
  • Wiki
  • 5.let's build
  • Nacelle

Last edited by lilal Mar 11, 2023
Page history
This is an old version of this page. You can view the most recent version or browse the history.

Nacelle

  • Overview
  • Materials needed
  • Tools needed
  • Build
    • 1.Place Upper Spacer on to the Yaw Pipe
    • 2.Tack-weld Upper Spacer on to the Yaw Pipe
    • 3.Place and Bearing Mounting Plate and Lower Spacer
    • 4.Tack-weld Bearing Mounting Plate and Lower Spacer
    • 5.Weld Bearing Mounting Plate and Lower Spacer
    • 6.Place the Wind Vane Socket
    • 7.Weld the Wind Vane Socket
    • 8.Paint the Nacelle

Overview

SubAssembly.Nacelle

Materials needed

No. Name Units TsDC-ID Reference
5 nacelle 1 ASM-MEC
5.01 housing bearing 2 COM-BUY UKF205, ball bearing unit with cast metal housing, locking on shaft via set screw
5.02 bearing mounting plate 1 COM-MAN Laser part, steel S235 or S355, 6 mm thick, no surface treatment, BearingMountingPlateUkf205.dxf
5.03 upper spacer 1 COM-MAN Laser part, steel S235 or S355, 6 mm thick, no surface treatment, UpperSpacer.dxf
5.04 lower spacer 1 COM-MAN Laser part, steel S235 or S355, 6 mm thick, no surface treatment, LowerSpacer.dxf
5.05 yaw pipe 1 COM-BUY Cylindric pipe, steel, no surface treatment, 60.3 x 3.65 x 140 mm
5.08 exterior metal paint 1 COM-BUY

Tools needed

No. Name
1 Welder
2 Welding equipment Gloves, Helmet, Welding Magnets
3 Square
4 Angle Grinder
5 Safety Glasses
6 Level
7 Meter

Build

1.Place Upper Spacer on to the Yaw Pipe

SubAssembly.Nacelle_1

2.Tack-weld Upper Spacer on to the Yaw Pipe

SubAssembly.Nacelle_2

3.Place and Bearing Mounting Plate and Lower Spacer

SubAssembly.Nacelle_3 SubAssembly.Nacelle_4

4.Tack-weld Bearing Mounting Plate and Lower Spacer

SubAssembly.Nacelle_5

5.Weld Bearing Mounting Plate and Lower Spacer

SubAssembly.Nacelle_6

6.Place the Wind Vane Socket

15mm distance

SubAssembly.Nacelle_7 SubAssembly.Nacelle_8

7.Weld the Wind Vane Socket

SubAssembly.Nacelle_9

8.Paint the Nacelle

SubAssembly.Nacelle_10

Clone repository
  • 1.Introduction
  • 2.System overview
  • 3.Tools and materials
    • 1.Bill of materials
    • 2.Tools
    • 3.CAD model
  • 4.Get the components
  • 5.Let's build
    • Alternator
      • Alternator Rotor
      • Alternator Stator
    • Nacelle
    • Rotor Blade
    • Wind Vane
  • 6.Let's assemble
  • Contributing
  • Home